LANJIGARH
Infrastructure
Significant infrastructural advancements have been triggered by the sustainable development initiatives of VAL. These include:
 
  1. Electrification of nine villages
  2. Black Top Road from Lanjigarh to Dahikhal
  3. Black Top Road from Lanjigarh to Pokharibandh
  4. Construction of internal concrete roads in Patrapada of Nangalbeda, Nutan Batelima, Jagannathpur, Kadanguda, Chhatrapur, Kenduguda and other villages.
  5. RCC Road with drain at Lanjigarh
  6. Construction of High Level Bridge at Nangalbeda and Lanjigarh
  7. Drain and concrete road at Lanjigarh
  8. HP Culvert and Drain at Basantpada
  9. Place of Congregation for Community Rites at Raghunathpur and Nutan Batelima
  10. Renovation of Ambodala Railway Station.
  11. Installation of High Mast Light and Traffic Signaling System at Bhawanipatna
  12. Establishment of a well-equipped Rehabilitation Colony.
  13. Construction of Tube Well Platforms in the peripheral villages
  14. Construction of Check Dams in the peripheral villages
  15. Construction of Community Hall at Chandanpur, Paikranipinda and Raghunathpur
  16. Renovation of Ecological Park at Bhawanipatna
  17. Construction of Stage at MSA, Bhawanipatna
  18. Construction of Computer Room at Saraswati Shishu Mandir, Ambodala
  19. Installation of Aqua Guard with Water Cooler at Bus Stand and Hospital at Bhawanipatna
  20. Installation of High Mast Light at Chhatiguda and Behrampur
 
Looking Ahead
One of the major premises of VAL’s sustainable development programmes is rural infrastructure. VAL recognizes that infrastructural inadequacy is a major challenge that rural communities face and strives to meet the demand for high quality facilities through partnerships with local communities, civil society groups and government departments. Some of the major planned initiatives on this front are the following:
 
  1. VAL will be installing street lights at Ambodala as a part of Project Ujala. This is a part of the electrification drive that the firm had embarked on as a part of this project. Pole installation work is also being done at Chanalima, Kenduguda, Bundel, Bhalupada.
  2. In keeping with its objective of developing basic infrastructure in peripheral villages, VAL will be constructing the steps at Ashrampada pond and the guard wall of the culvert at Lanjigarh.
 